CIRP : Final day of renovation work

CIRP = Casa Idaman Renovation Project

It’s the last day of the first month of 2011, and it’s also the last day that my contractor will do the renovation for my house. There are 2 things left to do. The second last thing to do is installing the KDK K14Y9-GY Baby Fan.

It’s done. This fan looks great in my study room, and is really a best thing for low ceiling. The wind is also quite strong, where at first I thought the wind will just be so so.

The last thing to do is fixing the tiles that were broken in the kitchen, as the result of wall hacking for additional power points.

This is also done.

After final check of the overall work from my contractor, handed him the final amount of money. That’s it. The renovation work for my house is finally done.

Got to worry about painting the house next.

** Read other stories about my Casa Idaman Renovation Project

Imran

Technical Manager at one of the market researcher company in KL who does blogging on his free time. Love cats very much. Always fascinated with new technology (as well as spending money on it)

9 Responses

  1. Ms J says:

    Masa baru pindah rumah J hari tu, mintak tolong 3 member untuk mengecat. 2 hari jugaklah baru habis.. tu pun 3rd room cat selapis je.. bila dah brenti ntah bila nak sambung pun tak tau dah ni.

  2. meowwmania says:

    wahh dah nak siap yer…

    cat kaler apa agaknya hurmm…

  3. Ju says:

    Nice plaster ceiling. Can u share the cost of plaster ceiling n contact no of contractor as well?
    Please email wjuani@ yahoo.com

  4. Wendy says:

    Nice reno. May I have the ceiling contractor too pls? my email: wendylpk74@gmail.com. Thanks.

  1. March 31, 2011

    […] Plaster ceiling work progress Renovation project almost completed Finding the direction of Kiblat Final day of renovation work Painting work Painting work finished Carpeting the study room Covering balcony […]

Leave a Reply to Imran Cancel reply

Your email address will not be published. Required fields are marked *